VIPVIP | | RSS
    Association Introduction | Association Event | Industry Information | Member News | Special Report | Technology Exchange
 
Positon: Home » Member News » news »

SORG The First to Set Batch in Motion

  • Released Date:2011-05-30
  • Valid until:Standing
  • View Time193
  • Details
SORG EME BATCH PREHEATING

One year ago the SORG batch preheater was extensively tested and demonstrated to glass specialists with 0 % cullet and a load of 60 t/day. The first fully operational unit will be installed this summer on a 240 ton container furnace. The entire furnace throughput will be fed through the batch preheater.

One year ago the SORG batch preheater was extensively tested and demonstrated to glass specialists with 0 % cullet and a load of 60 t/day. The first fully operational unit will be installed this summer on a 240 ton container furnace. The entire furnace throughput will be fed through the batch preheater.

The BATCH3 concept was presented yesterday at the Glassman in Barcelona.
 
[ Member NewsSearch ]  [ ]  [ Tell to friend ]  [ Print ]  [ Close ]  [ ]


Contact
You are not logged in, please sign in to view contact
You can do...if you are member
Info release Promotion
Building shop Online business
Not membership,free register now!
 
LatestMember News
 
 
Home | About | Contact | Use Policy | Copyright privacy | Site Map | Links | Message | Advertising
Copyright 2007-2008 China Architectural and Industrial Glass Association,All Rights Reserved ICP 05037132-4 Technology support:Beijing China Glass Modern Technology Glass Co. Ltd. Contact us:bjzb@glass.org.cn;glass@glass.org.cn Tel:010-68330662 Fax:010-68349127
Powered by Destoon 2.5